Start with a defined scope, not a price
The most common mistake in cleaning procurement is asking for a price before defining the work. Every contractor then prices a different imaginary scope, and comparison becomes meaningless. Build the scope first: areas, frequencies, presentation standards, access windows and periodic works. Then every quote you receive answers the same question.
A contractor who helps you build that scope — who walks the site and asks about operations — is already demonstrating how they will behave once the contract starts.
Compliance is the first filter, not the last
A cleaning contractor puts people into your building, often after hours and often unsupervised. Treat their paperwork as a safety control, not an administrative step. Current public liability insurance, workers compensation and a labour hire licence are the baseline in Victoria — our cleaning compliance checklist covers the full set, including police checks and WWCC where your site requires them.
Judge the specification, not the brochure
Ask each bidder for their cleaning specification — the document that tells their team what to do in your building. This is where contractors separate. A good specification names every area, every frequency and every standard. A poor one says “general cleaning as required”, which transfers all the risk to you.
- Area-by-area schedules with frequencies against each line
- Written presentation standards for each area type
- Chemical and equipment plans, with SDS management
- Supervision structure — who inspects, how often, and what gets recorded
References, communication and escalation
Ask for references from facilities like yours — same sector, similar size, similar hours. Then ask the reference the only question that matters: when something went wrong, what happened? A contract is defined less by its happy days than by its bad ones.
Agree the communication structure before signing: a named account contact, agreed response times for issues, and a review rhythm so the standard does not drift. For portfolios spread across several locations, our article on multi-site cleaning programs explains what centralised coordination should look like.
Contract structure and flexibility
Buildings change — tenants move, floors close, hours shift. A good contract has a review mechanism so the scope can be adjusted without renegotiating from scratch, and KPIs that measure outcomes (inspection scores, response times) rather than inputs (hours on site).
Red flags worth walking away from
If several of these appear together, the contract is likely to fail in its first quarter — and the cost of restarting a procurement process far exceeds the saving on the quote.
- A quote with no specification behind it
- No named contact — only a phone number and a promise
- Insurance or licence documents that cannot be verified as current
- Prices dramatically below every other bid — someone is cutting supervision, training or wages
- No answers about after-hours access, security and keys